Drafting Shipping and Delivery Clauses After Major Disruptions: What Buyers Should Add or Avoid
contractsshippingoperations

Drafting Shipping and Delivery Clauses After Major Disruptions: What Buyers Should Add or Avoid

JJordan Ellis
2026-05-14
26 min read

A buyer-focused guide to shipping clauses, risk allocation, notice, cure periods, liquidated damages, and termination after disruptions.

When shipping lanes get interrupted, carriers reroute, ports back up, and transit times become unpredictable, the weakest part of many commercial contracts shows up fast: vague delivery language. For small businesses, that vagueness can turn a routine purchase order into a dispute over who bears the loss, when the clock starts, whether the seller gets another chance to perform, and whether the buyer can walk away without paying for unusable goods. If your contracts still assume that shipping is predictable, you are carrying more risk than you probably intended.

This guide gives buyers practical drafting rules for shipping contract clauses, delivery terms, liquidated damages, notice requirements, cure periods, termination rights, risk allocation, and carrier liability. The goal is not to make every contract hostile. It is to make your commercial contracts resilient enough to survive volatile transit conditions without forcing you to absorb delays, damaged goods, surprise costs, or a broken supply chain. If you need a broader framework for vendor oversight and operational resilience, our guide on risk management from UPS is a useful companion, especially when your logistics performance affects customer service.

Pro Tip: In disruption-prone markets, the buyer’s best protection is not a single “on-time delivery” sentence. It is a coordinated set of clauses that define timing, notice, remedies, and exit rights in the same way your operations team thinks about escalation.

1. Why Delivery Clauses Break Down After Major Disruptions

Transit volatility exposes hidden drafting gaps

In stable shipping environments, parties often rely on habits rather than precision. A seller says it will “ship promptly,” the buyer expects arrival “within a reasonable time,” and nobody worries about reroutes, customs holds, weather events, or port congestion. After a major disruption, those soft phrases become arguments. The seller may claim a delay was unavoidable, while the buyer argues that the contract never permitted indefinite slippage. That is why the best shipping contract clauses define not only performance, but also the consequences of nonperformance.

Commercial teams often underestimate how much risk rides on the difference between “shipment date” and “delivery date.” In a volatile environment, that distinction can decide whether the buyer still has a live deal, whether inventory shortages cascade into missed sales, and whether the seller can insist that the goods were timely because they left the warehouse on schedule. For a broader perspective on operational delays and how businesses can forecast stress points, see Reading the Signs: How Students and Early-Career Professionals Can Spot Job Risk in Cyclical Industries and apply the same habit of looking for leading indicators in your supply chain.

Risk allocation should match operational reality

Many contracts still allocate transit risk as if the carrier were an invisible extension of the seller. In practice, the seller may control packing and tendering, the carrier controls movement, and the buyer suffers the commercial fallout if goods arrive late or damaged. A thoughtful clause should separate these layers. The seller can be responsible for proper packaging, accurate documentation, and timely handoff to the carrier, while the buyer may accept certain transit risks once goods are loaded, subject to express exceptions for improper packaging or routing errors.

For buyers, the mistake to avoid is accepting language that shifts nearly all risk after title passes, especially if title passes at shipment and the goods are time-sensitive. In those cases, the buyer may have no meaningful remedy if the carrier delays the shipment by days or weeks. Instead, consider tying risk to actual delivery, adding carrier-performance standards, or requiring the seller to maintain transit insurance and tracking. If your procurement process also touches digital services or connected workflows, our article on architecting enterprise workflows with data contracts offers a useful analogy: define interfaces clearly or the operational burden lands on the customer.

Disruptions are not just force majeure events

Some businesses assume a force majeure clause will solve every transit problem. It will not. Force majeure is often narrow, highly negotiated, and subject to notice and mitigation duties. Many shipping problems after major disruptions are not true impossibility; they are increased cost, slower routes, limited capacity, or partial service degradation. Those issues may not excuse performance unless the clause says so. Buyers should not let sellers use broad, undefined disruption language as a permanent shield for ordinary logistical failure.

For teams building more resilient operational playbooks, it can help to study adjacent sectors that formalize contingency planning. For example, energy resilience compliance for tech teams shows how systems stay reliable by anticipating interruption rather than hoping it never arrives. Shipping clauses need the same mindset.

2. The Core Shipping Clause Stack Every Buyer Should Review

Define the delivery term with operational precision

Start with the most basic question: what exactly counts as delivery? Does delivery occur when the goods leave the warehouse, reach the port, clear customs, arrive at the buyer’s dock, or get signed for by receiving staff? Ambiguity here is expensive. The best drafting choices are simple but specific. If your business depends on inventory availability, you usually want delivery to mean physical receipt at the named destination, not just tender to the carrier.

Where possible, align the clause with the commercial reality of your supply chain. If the seller is closer to the origin but you need control over last-mile delivery, specify destination delivery and require a tracking number, carrier name, expected arrival window, and proof of delivery. If you are buying from overseas, add an Incoterms reference only if you understand its consequences and the clause does not conflict with the rest of the contract. To improve how you evaluate vendors and logistics partners, take a look at how trade buyers can shortlist manufacturers by region, capacity, and compliance.

Specify shipping method, routing, and packing obligations

Do not leave carrier selection, packaging, or routing to “seller’s discretion” if you care about timing or damage risk. Sellers should be required to use commercially reasonable carriers, follow agreed routing instructions, and package goods in a manner suitable for the specific transit path. If the goods are fragile, temperature-sensitive, or high value, the contract should say so plainly. A seller that ships delicate inventory in generic packaging may later argue that the carrier caused the damage, but the buyer needs the clause to preserve claims against both parties.

There is a useful lesson in how product teams think about design for real-world use. A piece on functional printing and smart labels reminds us that packaging is not just presentation; it is information, protection, and process control. In commercial contracts, packing language should serve the same function.

Match shipping terms to business-critical dates

Many buyers focus on “delivery within X days” without connecting that date to inventory, launch, or customer commitments. That is a mistake. If a late shipment means a retail miss, a construction delay, or a missed service launch, the contract should state that time is of the essence. Then identify the milestone date, the grace or cure window, and the business consequence if the deadline is missed. Without that chain, a seller may argue that timing was “estimated” rather than mandatory.

For an example of how market-sensitive timing affects buying decisions, read best bargains at Amazon and which titles are worth buying. Consumer buying has flexibility; B2B inventory commitments often do not. Your contract should reflect the difference.

3. Notice Requirements: Make Problems Visible Early

Require prompt notice of anticipated delays

One of the most valuable buyer protections is an early warning obligation. The seller should have to notify the buyer as soon as it knows, or reasonably should know, that the goods may be delayed, damaged, rerouted, or held at customs. Notice should not wait until the scheduled delivery date has already passed. Early notice gives the buyer time to find substitutes, adjust labor planning, and mitigate customer impact. In practice, this may matter more than the delay itself.

Notice language should include format, timing, and content. Require written notice by email to named contacts, not just a generic portal alert. Require the notice to state the cause of delay, the revised expected date, the goods affected, and the seller’s mitigation steps. If you work with small teams, this clarity matters even more because a missed email can become a missed sales window. For a practical parallel on operational communication, see adapting to change in Gmail features, which shows how workflow systems fail when communication channels are not deliberate.

Allocate the burden of proof for delay claims

When disruptions happen, sellers often assert vague explanations: customs issues, port backlog, carrier shortage, or geopolitical events. Buyers should ask for documentary support. The clause can require reasonable evidence of the delay, such as carrier notices, bills of lading, customs hold letters, or route-change confirmations. This does not eliminate disputes, but it raises the quality of the conversation and discourages generic excuses.

For businesses managing large volumes of orders, a clear proof requirement also creates a better internal record. If you later need to invoke liquidated damages or termination rights, the notice trail matters. If you want a wider framework for using evidence to make better business decisions, monitoring financial activity to prioritize site features offers a useful mindset: collect the right signals before you decide.

Don’t accept notice clauses that excuse silence

Some supplier templates say the seller must give notice “where practicable” or “if commercially reasonable.” Those phrases may sound flexible, but they can also create loopholes. Buyers should avoid notice standards that make timing optional. If the seller is unable to provide exact timing, it can still provide estimated timing, the reason for uncertainty, and the next update interval. A delayed or silent seller should not gain protection simply by saying information was hard to get.

Where disruption is systemic, you can also require periodic status updates until the goods arrive. That is especially valuable in volatile transit environments, because one initial notice is often not enough. A shipment can move from delayed to lost to re-routed, and your team needs visibility at every step.

4. Cure Periods and Escalation: Give the Seller a Chance, But Not Endless Time

Use cure periods that fit the business purpose

Cure periods should be tied to the value of the shipment. A short shelf-life product, event supplies, or launch inventory may justify a very short cure period or no cure period at all after the deadline is missed. A noncritical replenishment order may support a longer opportunity to cure. The point is to avoid a one-size-fits-all period that either gives the seller too much breathing room or lets the buyer terminate too quickly for a fixable issue.

In drafting, be explicit about what can be cured. A seller may cure by expediting replacement goods, upgrading transport, or delivering substitute items approved by the buyer. But if the original goods are useless because the market window has passed, “cure” should not mean the seller can show up late and still claim full performance. For more on how operational delays change value over time, compare the logic in smarter restocks using sales data. Timing affects value, not just delivery.

Escalate after the first missed deadline

Strong clauses use a step-down escalation path. After a missed deadline or failed delivery, the seller must notify, propose remediation, and execute a cure plan. If the seller misses the revised date, the buyer can then trigger broader remedies, including cover purchases, chargebacks, liquidated damages, or termination. This layered approach creates discipline without overreacting to a single operational hiccup.

For buyers, escalation is especially helpful when dealing with repeat suppliers. A one-off delay might be tolerable; a pattern of missed dates usually is not. If the seller’s service levels are chronically inconsistent, the contract should create real consequences. Businesses in fast-moving consumer categories understand this intuitively, which is why even restaurant operators use detailed checks like grab-and-go container checklists to prevent small packaging failures from becoming customer complaints.

Limit cure rights where substitution matters

Buyers should be careful about accepting a cure right that lets the seller swap in anything vaguely similar. If the contract is for branded goods, regulated materials, custom components, or time-sensitive inventory, substitution may be unacceptable. The clause should say replacement goods must conform to specifications, comply with applicable law, and arrive within the business-critical window. If not, the buyer can reject the cure and pursue remedies.

This is particularly important when the buyer’s downstream commitments are already fixed. If your own customer contracts, production schedule, or event date depends on timely delivery, a substitute delivery after the fact may create more harm than help. That is why the cure clause should not be drafted in isolation from the rest of the commercial contract.

5. Liquidated Damages: Make the Remedy Real, Not Punitive

Use damages that reflect likely loss

Liquidated damages are valuable when actual damages are hard to prove but a late shipment causes measurable harm. The best clauses use a reasonable forecast of expected loss, not a penalty. Buyers should document why the amount makes sense: lost sales, overtime labor, expedited replacement cost, storage charges, project delay, or customer penalties. That documentation supports enforceability and makes the clause more credible in negotiations.

A practical approach is to create a graduated schedule. For example, apply a daily amount for each day of late delivery, with a cap that reflects the contract’s economics. For high-stakes transactions, tie the amount to the percentage of order value or specific operational costs. You can also create different amounts for partial shipments, missing key components, or failure to provide required documentation. This is similar to how a well-structured buying strategy distinguishes between baseline value and premium features, as seen in buy-or-wait pricing decisions.

Avoid penalties dressed up as damages

Courts often scrutinize liquidated damages that look punitive rather than compensatory. If the number is wildly disconnected from the likely loss, the clause may be challenged. Buyers should avoid arbitrary amounts chosen only because they “sound tough.” Instead, connect the number to real business assumptions, and if needed, maintain a short internal memo explaining the basis for the formula. That internal record can be extremely helpful if the clause is ever questioned.

One way to make liquidated damages more defensible is to tie them to delayed milestones rather than mere calendar days. The late arrival of a critical component before production is often much more expensive than a routine restock arriving two days late. The clause should reflect that difference. Where disputes are likely, well-documented operational logic is as important as the legal wording.

Preserve other remedies unless you intentionally waive them

Buyers frequently assume that liquidated damages are an added remedy. But some contract templates state they are the exclusive remedy for delay. That can be dangerous. If the seller’s delay also causes defective performance, compliance failures, or loss of use, the buyer may want broader rights. Unless your commercial strategy says otherwise, preserve the right to seek cover, indemnity, or termination in addition to liquidated damages where legally permitted.

For a useful contrast between a simple cost model and a more complete loss model, see the hidden costs behind flip profit. Shipping delays often generate hidden costs in the same way: the obvious loss is only part of the picture.

6. Termination Rights: Know When to Walk Away

Build termination rights around performance failure, not just breach language

Many contracts say a party may terminate for “material breach,” but that standard can be hard to apply in a disruption. Buyers should spell out what counts as a termination trigger. Common examples include repeated late delivery, failure to meet a revised delivery date, failure to provide required notice, loss or damage beyond a stated threshold, or inability to secure alternative routing within a defined period. This turns termination from a courtroom argument into a business rule.

Termination rights are especially important when timing is part of the product. A late shipment of promotional materials before a launch, for example, may make the goods commercially useless even if they eventually arrive. In such cases, the contract should let the buyer terminate for missed business-critical dates, not only for total non-delivery. If your business is also thinking about product lifecycle and timing, the logic in when to end support for old CPUs is a useful analogy: continuing an outdated system can cost more than replacing it.

Draft termination without a trapdoor

Be careful with termination provisions that require many layers of notice, long cure windows, and executive escalation before the buyer can exit. Those requirements can become a trapdoor in a volatile environment, forcing the buyer to keep accepting poor performance while losses mount. Instead, reserve a fast exit right for severe delay, repeated missed milestones, or shipment failure after a stated cure attempt. You can still maintain a formal process, but it should not make termination impossible.

A balanced clause often includes immediate termination for extreme events such as total loss, refusal to ship, regulatory seizure, or a delay exceeding a hard deadline in time-sensitive transactions. That gives the buyer leverage without ending the relationship over every minor slip. It also encourages the seller to prioritize your account when transit capacity becomes tight.

Coordinate termination with cover and transition rights

When a buyer terminates, it should be able to source replacement goods or services quickly. The contract should say the seller is responsible for reasonable cover costs when termination is caused by its breach. It should also require the seller to cooperate in transition, provide order status, release inventory records, and stop any further shipment of rejected goods. If you do not draft the transition process, termination can solve the legal issue while leaving the operational problem unresolved.

Good transition planning is not unique to shipping. The same principle appears in content, staffing, and technology workflows. See repurposing long-form interviews into a content engine for a reminder that well-designed transitions reduce waste and preserve value.

7. Carrier Liability, Insurance, and Proof of Loss

Know who is supposed to chase the carrier

Carrier liability is frequently misunderstood. If the seller arranges carriage, the buyer may still need the seller to help pursue claims, supply documentation, and coordinate with the carrier. The contract should require the seller to maintain and share shipping records, packaging specs, and proof of handoff. It should also require cooperation in any claim against the carrier or insurer. Without that cooperation duty, the buyer may have a paper claim but no practical recovery.

In high-value or fragile shipments, the buyer should consider requiring the seller to purchase adequate cargo insurance naming the buyer as an additional insured or loss payee where feasible. The insurance clause should state coverage limits, deductibles, exclusions, and claim notice deadlines. If the seller’s insurer can deny coverage based on packing or routing issues, the clause should make sure the seller remains directly responsible for those failures.

Do not confuse carrier liability with contractual responsibility

A carrier may have statutory or contractual liability limits, but those limits do not automatically protect the seller or eliminate the seller’s own breach. If the seller promised a specific delivery date or packaging standard, the buyer can still pursue the seller even if the carrier is partially at fault. Your contract should preserve that distinction. The seller should not be able to say, “The carrier lost it, so our obligation ends,” unless the buyer expressly agreed to that allocation.

For another example of how businesses assess reliability before they commit, see how to vet cycling data sources. The same principle applies here: do not rely on the first explanation; check the quality of the source and the backup evidence.

Document loss and damage in a way that supports recovery

The contract should require prompt inspection, photo evidence, retaining packaging, and written notice of visible damage or shortage. Buyers should train receiving staff on what to record when deliveries arrive late or damaged. If you do not capture the facts immediately, later recovery efforts become much harder. In disruptions, the claim is often won or lost at the loading dock, not in legal review.

This is where operational procedures and contract drafting intersect. A good clause says what must happen; a good process ensures it actually happens. If you manage teams that handle multiple vendors, you may also find value in

8. Practical Clause Language Buyers Should Consider

Elements to add

A resilient shipping clause package typically includes: a precise delivery definition, named destination, shipping method requirements, prompt notice of delay, evidence of disruption, cure period tailored to the goods, liquidated damages tied to real loss, termination rights for repeated or severe delays, and cooperation obligations for claims and transitions. It should also include a service-level structure if the shipment is part of an ongoing supply arrangement. The more time-sensitive the transaction, the more the clause should resemble a mini service-level agreement rather than a generic purchase-order note.

If you need a model for how service expectations can be framed like performance standards, consider the structure used in retention analytics. Different context, same lesson: measure what matters and define consequences for misses.

Elements to avoid

Avoid vague terms like “best efforts” without measurable standards, “reasonable delay” without a time cap, and “subject to availability” unless you genuinely want the seller to have that escape hatch. Be cautious with clauses that let the seller unilaterally switch carriers, routes, or delivery dates without notice. Also avoid provisions that make buyer acceptance of late shipments mandatory once the seller claims a disruption. In a volatile transit environment, those clauses can quietly erase your leverage.

Another common problem is a broad disclaimer of all consequential damages combined with no liquidated damages clause. That combination can leave the buyer with almost no meaningful remedy for delay, because the most important losses from late delivery are often indirect. If you are going to waive those damages, replace them with a predictable, enforceable remedy.

A working comparison table

Clause TopicBuyer-Friendly DraftingRisky DraftingWhy It Matters
Delivery definitionPhysical receipt at named destinationDelivery upon shipmentControls when risk and performance obligations end
Delay noticeWritten notice within 24 hours of anticipated delayNotice when practicableEarly notice enables mitigation and cover
Cure periodShort, goods-specific cure windowOpen-ended cure at seller’s discretionPrevents indefinite slippage
Liquidated damagesReasonable formula based on forecast lossArbitrary daily penaltyImproves enforceability and bargaining power
Termination rightsTrigger after repeated misses or hard deadline failureOnly for material breach after extended processLets buyer exit before value is destroyed
Carrier claimsSeller must cooperate with insurance and carrier recoveryNo cooperation obligationImproves chance of recovering loss

As with consumer decision-making in volatile markets, such as protecting airline miles and hotel points, the best protection comes from clear rules before the disruption happens.

9. Negotiation Strategy for Small Businesses

Prioritize the clauses that actually protect cash flow

Small businesses do not need to win every drafting point, but they do need to protect the items that affect cash, customer commitments, and reputation. If you cannot get every seller to agree to broad liability, focus on the highest-value protections: firm delivery dates, prompt notice, a reasonable cure period, and a termination right for repeated failure. Those provisions create leverage without making the deal impossible to sign.

When negotiating, explain the business rationale. Sellers are more likely to accept buyer-friendly shipping terms if they understand the goods are tied to a promotion, a production run, a regulated filing, or a customer deadline. It often helps to present a simple fallback hierarchy: first, substitute shipping at the seller’s cost; second, credit or liquidated damages; third, termination if the revised date is missed. That structure feels commercially fairer than a blunt penalty.

Use exhibits and order forms to reduce ambiguity

If the main agreement is long, put the operational details in an exhibit or order form. List destinations, expected lead times, packaging requirements, escalation contacts, and proof-of-delivery standards. This makes it easier for procurement, operations, and legal teams to work from the same playbook. It also reduces the risk that a sales rep promises one thing while the master agreement says another.

For businesses trying to improve repeatability across vendors and projects, the discipline in turning market analysis into repeatable content formats is a useful model. Standardization lowers friction and improves quality.

Keep the dispute path practical

Do not turn every late shipment into arbitration with executive mediation, board notice, and a multi-week cure process. Complex escalation can be appropriate for enterprise deals, but small businesses need a path that matches the speed of the problem. A short notice, short cure, and fast cover-rights framework is usually better than a formal process that arrives after the season is over.

If the other side wants more process, ask for a narrower concession in return. For example, offer a longer cure period in exchange for stronger notice obligations or a firm liquidated damages schedule. Smart drafting is often about tradeoffs, not absolute wins.

10. A Buyer’s Pre-Sign Checklist for Disruption-Ready Shipping Terms

Ask these questions before you sign

Before finalizing a supply or purchase agreement, ask whether the delivery date is meaningful, whether the seller must notify you before missing it, whether you have the right to reject late cure attempts, whether liquidated damages are usable in real life, and whether termination rights are tied to business value rather than abstract legal standards. If the answer to any of those is unclear, the draft is not ready.

Also check whether the contract is internally consistent. The risk of loss clause should not contradict the delivery clause. The force majeure clause should not silently swallow every logistics problem. The remedy clause should not eliminate the only remedy that matters. Contract review is not about spotting one bad sentence; it is about ensuring the system works as a whole.

Build process around the clause, not just the clause itself

Even the best drafting fails if the business does not operationalize it. Train your receiving team, procurement staff, and account managers on what counts as notice, what evidence to capture, and when to escalate. Keep a log of delay notices and revised ETAs. If a shipment is late enough to trigger liquidated damages or termination, do not rely on memory. Use the contract and the records together.

This is similar to how businesses build scalable operations around tools and workflows. A helpful analogy comes from real-time communication technologies: the technology matters, but the workflow determines whether the message gets through when it counts.

Review annually, not only after a dispute

Transit conditions change. So do carrier networks, customs patterns, geopolitical risks, and customer expectations. Revisit your standard shipping and delivery clauses at least once a year, or after a major disruption hits your sector. A clause that worked during normal conditions may be too loose, too rigid, or too expensive when the market changes.

If your business wants better commercial discipline across all vendor relationships, compare your shipping language against the diligence used in manufacturer vetting and similar operational review processes. The best contracts are living documents, not static templates.

Conclusion

Major disruptions do not just delay shipments; they reveal whether your contracts were built for real-world volatility or wishful thinking. Buyers who draft precise shipping contract clauses can dramatically reduce exposure by tightening delivery terms, adding mandatory notice requirements, tailoring cure periods, using defensible liquidated damages, and preserving termination rights when performance collapses. They can also improve carrier liability recovery, strengthen documentation, and make escalation faster and more predictable.

The main rule is simple: do not let the seller control the whole story after the goods leave the dock. Keep a firm grip on timing, notice, remedies, and exit rights. If you need to build a broader legal operations system around contract intake, vendor review, or dispute management, you may also find value in operationalizing AI safely, which shows how structured rules make complex processes more reliable.

For small businesses, the goal is not perfection. It is exposure control. In unstable shipping environments, a well-drafted contract is one of the few tools that can turn uncertainty into manageable risk.

FAQ

1. Should the delivery clause say “shipment” or “receipt”?

For most buyers, “receipt” is safer because it ties performance to actual arrival at the destination. “Shipment” usually benefits the seller, especially if the carrier is delayed or the goods are damaged in transit. If your business depends on inventory availability, use receipt-based language unless you are intentionally shifting transit risk earlier.

2. How long should a cure period be after a delayed shipment?

It depends on the goods and the business purpose. Time-sensitive inventory may justify a very short cure period or no cure period after the deadline passes. Routine replenishment may allow a longer period. The key is to match the cure window to the real-world value of late performance.

3. Are liquidated damages enforceable for late delivery?

They can be, if the amount is a reasonable forecast of likely loss and not a penalty. The safest approach is to tie the amount to measurable business impacts such as overtime, cover purchases, or known downstream penalties. Arbitrary or extreme numbers are more likely to be challenged.

4. What if the seller says a disruption makes performance impossible?

That depends on the force majeure language. Many shipping problems are delays or cost increases, not true impossibility. If the contract does not clearly excuse those conditions, the seller may still be responsible. Buyers should require prompt notice, mitigation, and evidence if the seller invokes disruption-based excuses.

5. When should a buyer terminate instead of waiting for cure?

Terminate when the delay destroys the value of the contract, when the seller misses a hard deadline, or when repeated failures show the problem is systemic. If the late shipment makes your own customer commitments impossible to meet, the contract should allow you to exit quickly and source replacements.

6. Do carrier liability limits protect the buyer?

Not necessarily. Carrier liability limits may affect recovery from the carrier, but they do not erase the seller’s contractual duties unless the agreement says so. The buyer should preserve claims against the seller for packaging, routing, notice, and delivery failures, even if the carrier is involved.

Related Topics

#contracts#shipping#operations
J

Jordan Ellis

Senior Legal Content Strategist

Senior editor and content strategist. Writing about technology, design, and the future of digital media. Follow along for deep dives into the industry's moving parts.

2026-05-14T08:23:26.690Z